Tufts Medical Center EP3 Cardiac Arrhythmia Lab Renovation
Specs
Location: Boston, MA
Size: 1,000 SF
Duration: 21 Weeks
Contract: $2.25M
GAGE Construction completed the renovation of the New England Cardiac Arrhythmia Center on the third floor of Tufts Medical Center’s South Building, delivering complex upgrades within an active clinical environment. The project included phased demolition and reconstruction, architectural reconfiguration, and extensive HVAC, electrical, and building systems upgrades to support specialized cardiac diagnostic and treatment functions.
Work was carefully coordinated to maintain patient safety, infection control, and uninterrupted hospital operations. Through detailed planning and close collaboration with hospital leadership and consultants, GAGE delivered a modernized, high-performance clinical space that enhances patient care and operational efficiency.

