Tufts Medical Center – LINAC Upgrades
Specs
Location: Boston, MA
Size: 950 SF
Duration: 12 Weeks
Contract: $1M
GAGE completed upgrades to the linear accelerator (LINAC) suite at Tufts Medical Center, involving the removal of existing radiation therapy equipment and preparation of the space for new technology. The project included demolition and removal of the existing LINAC within the active vault, installation of new supporting infrastructure to accommodate upgraded equipment, and minor architectural and cosmetic improvements. Work was carefully coordinated to meet stringent radiation safety and operational requirements. The completed upgrades deliver a modernized treatment environment that supports advanced radiation therapy services and long-term clinical performance.

